(800) 605-3091
    Home ProjectsR1VER – TIA & Traffic Signal Design

R1VER – TIA & Traffic Signal Design

Location: Northwest corner of S. 1st Street with W Becher Street, City of Milwaukee
TADI's Role: Provide a TIA with recommended roadway, signal and pedestrian improvements for City of Milwaukee approval along with signal design modification/installation plans

TADI prepared the traffic impact analysis (TIA) for the R1VER development, a planned office, retail, and residential redevelopment on the Kinnickinnic River at Becher Street & 1st in the City of Milwaukee. After acceptance of the TIA, the City retained TADI to develop construction plans, specifications, and estimates for existing traffic signal removal and replacement, as well as temporary signals, at the intersection of 1st Street at Becher Street.

Project tasks included:

• Data collection
• Traffic analysis
• TIA report including recommendations to mitigate traffic impacts
• Traffic signal plan, specification, and estimate preparation (design includes trombone arms, video vehicle detection, pedestrian accommodations, and emergency vehicle preemption)
• Traffic signal timings

For more information please contact
John Bieberitz at [email protected]