- Howell Avenue at Ryan Road (STH 100)
- Howell Avenue at Centennial Avenue
- Howell Avenue at Puetz Road
- Howell Avenue at Forest Hill Avenue
- Howell Avenue at Susan Drive
- Howell Avenue at Drexel Avenue
- Howell Avenue at Rawson Avenue
- Howell Avenue at College Avenue
- Howell Avenue at STH 119
- Howell Avenue at Grange Avenue
TADI developed construction plans, specifications, and estimates for approximately 7.5 miles of fiber-optic traffic signal interconnect along Howell Avenue from Oakwood Road to Grange Avenue, incorporating 11 signalized intersections into the system.
Project tasks included:
- Plan, specification, and estimate preparation (design includes monotubes, video vehicle detection, and emergency vehicle preemption)
For more information please contact:
Jeffrey Fait: [email protected]
Jeffrey Fait: [email protected]