(800) 605-3091
    Home ProjectsHowell Avenue Reconstruction Traffic Signal Design

Howell Avenue Reconstruction Traffic Signal Design

Location: Howell Avenue from Oakwood Road to Grange Avenue, Milwaukee and Oak Creek, WI
TADI's Role: Temporary/Permanent Traffic Signal and 7.5 Miles of Fiber-Optic Interconnect Design
  • Howell Avenue at Ryan Road (STH 100)
  • Howell Avenue at Centennial Avenue
  • Howell Avenue at Puetz Road
  • Howell Avenue at Forest Hill Avenue
  • Howell Avenue at Susan Drive
  • Howell Avenue at Drexel Avenue
  • Howell Avenue at Rawson Avenue
  • Howell Avenue at College Avenue
  • Howell Avenue at STH 119
  • Howell Avenue at Grange Avenue

TADI developed construction plans, specifications, and estimates for approximately 7.5 miles of fiber-optic traffic signal interconnect along Howell Avenue from Oakwood Road to Grange Avenue, incorporating 11 signalized intersections into the system.

Project tasks included:

  • Plan, specification, and estimate preparation (design includes monotubes, video vehicle detection, and emergency vehicle preemption)
For more information please contact:
Jeffrey Fait: [email protected]